Tormach CNC Lathe: Difference between revisions

From makerspace.tulane.edu
Jump to navigation Jump to search
(Created page with "CNC Lathe Training 1: *Fit the chuck key into the chuck and rotate until the chuck is wide enough to accept your 1" piece of stock. *Take the stop tool and ensure that you ha...")
 
No edit summary
Line 2: Line 2:


*Fit the chuck key into the chuck and rotate until the chuck is wide enough to accept your 1" piece of stock.
*Fit the chuck key into the chuck and rotate until the chuck is wide enough to accept your 1" piece of stock.
*Take the stop tool and ensure that you have a minimum of 2" of stock sticking out of the chuck.  
*Take the stop tool and ensure that you have a minimum of 3" of stock sticking out of the chuck.  
*Tighten up the chuck with an extra tug, spin the chuck to make sure that the stock is properly secured.
*Tighten up the chuck with an extra tug, spin the chuck to make sure that the stock is properly secured.
*Take the chuck key and put it on the workbench (it's very dangerous to leave them unaccounted for)
*Take the chuck key and put it on the workbench (it's very dangerous to leave them unaccounted for)
*Remove whatever tool is in the quick change tool post holder and place it on the workbench
*Blow compressed air onto the empty holder to clear all chips and debris
*Load tool 1 (RH turning tool) into the tool holder and secure the tool

Revision as of 22:34, 7 July 2017

CNC Lathe Training 1:

  • Fit the chuck key into the chuck and rotate until the chuck is wide enough to accept your 1" piece of stock.
  • Take the stop tool and ensure that you have a minimum of 3" of stock sticking out of the chuck.
  • Tighten up the chuck with an extra tug, spin the chuck to make sure that the stock is properly secured.
  • Take the chuck key and put it on the workbench (it's very dangerous to leave them unaccounted for)
  • Remove whatever tool is in the quick change tool post holder and place it on the workbench
  • Blow compressed air onto the empty holder to clear all chips and debris
  • Load tool 1 (RH turning tool) into the tool holder and secure the tool